All Program Documents

All VCS requirements are included in the Version 3 documents below.

Documents are updated periodically. Please check this page quarterly to be sure you are using the latest version of a given document. For a running catalogue of all updates, see the Updates to VCS Version 3.

Having trouble finding the correct VCS document online? Send us your feedback at secretariat@v-c-s.org

Requirements

VCS Program Guide, v3.2

Current Version: v3.2 Issued: 1 February 2012

The VCS Program Guide is the overarching VCS Program document. It sets out all rules and requirements governing the VCS Program, including the project registration process, the methodology approval process, the accreditation requirements for validation/verification bodies, and the functioning of the VCS registry system.

VCS Standard, v3.2

Current Version: v3.2 Issued: 1 February 2012

The VCS Standard sets out all specific requirements for developing projects and methodologies, and for the validation, monitoring and verification of projects and GHG emission reductions and removals. Four sub-documents elaborate on specific aspects of VCS Standard, setting out detailed requirements for AFOLU and ODS projects and methodologies, as well as program definitions and fees.

AFOLU Requirements, v3.2

Current Version: v3.2 Issued: 1 February 2012

The AFOLU requirements document sets out detailed requirements for developing projects and methodologies in the Agriculture, Forestry and Other Land Use (AFOLU) sector.

ODS Requirements, v3.1

Current Version: v3.1 Issued: 19 October 2011

Sets out detailed requirements for developing ozone-depleting substances (ODS) projects and methodologies.

Program Definitions, v3.2

 Current Version: v3.2 Issued: 1 February 2012

Program Definitions is a reference that defines all terms used in VCS Program documents.

Program Fee Schedule, v3.3

Current Version: v3.3 Issued: 1 February 2012

The Program Fee Schedule sets out the fees applicable under the VCS Program.

Procedural

Registration & Issuance Process, v3.2

Current Version: v3.2 Issued: 1 February 2012

The Registration & Issuance Process documents sets out the procedures and rules for registering projects and issuing verified carbon units.

Methodology Approval Process, v3.3

Current Version: v3.3 Issued: 1 February 2012

The Methodology Approval Process document sets out procedures and rules for the approval of VCS methodology elements.

AFOLU Non-Permanence Risk Tool, v3.1

Current Version: v3.1 Issued: 1 February 2012

The AFOLU Non-Permanence Risk Tool sets out the procedure for conducting non-permanence risk analysis and buffer determination for AFOLU projects.

Templates & Forms

Project Description, v3.0

Current Version: v3.0 Issued: 8 March 2011

Project description template

Monitoring Report, v3.1

Current Version: v3.1 Issued: 1 February 2012

Monitoring report template

Registration Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of the project

Registration Representation (multiple PPs), v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of the project with multiple project proponents

Issuance Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of GHG emission reductions or removals

Issuance Representation (multiple PPs), v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of GHG emission reductions or removals from projects with multiple project proponents

Validation Report, v3.1

Current Version: v3.1 Issued: 1 February 2012

Validation report template

Validation Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of validation

Verification Report, v3.1

Current Version: v3.1 Issued: 1 February 2012

Verification report template

Verification Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of verification

Non-Permanence Risk Report, v3.0

Current Version: v3.0 Issued: 8 March 2011

Risk report template for describing and analyzing the non-permanence risk for AFOLU projects

Loss Event Report, v3.1

Current Version: v3.1 Issued: 1 February 2012

Loss event report template for estimating an unplanned loss of carbon stock for AFOLU projects

Loss Event Representation, v3.0

Current Version: v3.0 Issued: 1 February 2012

Deed of representation issued in respect of the loss event report, for project proponents

Methodology, v3.1

Current Version: v3.1 Issued: 1 February 2012

Methodology template

Module, v3.1

Current Version: v3.1 Issued: 1 February 2012

Module template (for tools and modules)

Methodology Approval Process Submission Form, v3.0

Current Version: v3.0 Issued: 8 March 2011

Form for submitting a methodology element to the VCSA

Methodology Element Approval Request Form, v3.0

Current Version: v3.0 Issued: 8 March 2011

Form for requesting final approval of a methodology element from the VCSA

Methodology Assessment Report Template, v3.0

Current Version: v3.0 Issued: 19 October 2011

Report template for validation/verification bodies conducting a first or second methodology assessment.

Methodology Expert Application Form, v3.2

Current Version: v3.2 Issued: 1 February 2012

Form for submitting an application to become a methodology assessment expert 

Accession Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of project proponents joining a project

Partial Release Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of project proponents leaving a project

VCU Conversion Representation, v3.0

Current Version: v3.0 Issued: 8 March 2011

Deed of representation issued in respect of conversion of GHG credits into VCUs